jefarmjefarm1625 jefarmjefarm1625
  • 25-02-2018
  • Mathematics
contestada

If A completes a particular work in 8 days and B the same work in 24 days. How many days will it take if they work together?

Respuesta :

Аноним Аноним
  • 25-02-2018
A:
1 day = 1/8 of work

B:
1 day = 1/24 of the work

Together:
 1 day = A + B = 1/8 + 1/24 = 4/24 = 1/6

1 day = 1/6 of work
1/6 x 6 of work = 1 x 6 days
work =  6 days 

Answer Link

Otras preguntas

During replication which sequence of nucleotides would pair with the dna segment tatga
Identify and list the major cell structures that are contained within both prokaryotic and eukaryotic cells. provide 4 examples
facts about ludicrous
what changes did the magna carta bring about in english government?
A regular hexagon is inscribed (vertices lie on the circles) in a circle. a. what percent of the area of the circle is overlapped by the area of the inscribed r
convert 153 degrees into radians to the nearest to decimals places
What is the space race? Tell me ASAP plz! Worth 10 points
PLEASE HELP ME WITH MATH
The number of people contacted at each level of a phone tree can be represented by f(x) = 3^x, where x represents the level. What is x when f(x) = 27? A. x =
How long did the molimo festival last in forest people?