A _____ might involve maximums for one or more resources, such as time, dollars, or people.
a. ​milestone
b. ​constraint
c. ​task id
d. ​successor task

Respuesta :

andriansp andriansp
  • 01-02-2018
I believe the answer is B. constraint.
A constraint usually made because of a limited amount for tyof resourcerce that exist for certain type of factors. The purpose of a constraint is usually to make sure that the organization could still achieve its goal while staying on the budget that they have previously created.
Answer Link

Otras preguntas

S= √3+2√3+3√3+...10√3 write S as a√3
What the equation of this graph in slope-intercept form?
PLZZZZZZZZZZZZZZZZZ ANSWER What would happen if a rebuttal only had a set out counterclaims…what would happen? Prove it!!!!!!
what are the observation of laying of paving stone​
what is the respiration through skin called?​
In which process are the products of the reaction glucose and oxygen? A. photosynthesis B. ADPproduction C. ATP production D. cellular respiration
Analyze the map below and answer the question that follows. A map of Asia with Southeast Asian countries highlighted. Two bodies of water are labeled A and B. A
Choose the product. -7p 3(4p 2 + 3p - 1)
look at the photo. top angle is 2x+6 bottom angle is 3x-25 and other angle is y. find the values of x and y​
best answer gets brainiest