angklyl31 angklyl31
  • 24-12-2021
  • Computers and Technology
contestada

Project planning output is :

A. Top-down planning

B. Bottom up planning

C. Waterfall planning

D. Iterative planning

Respuesta :

MubeenAshraf
MubeenAshraf MubeenAshraf
  • 25-12-2021

Answer:

A

Explanation:

The main output of Project palnning is project plan.

Answer Link

Otras preguntas

What is the on step differen of extravasation of naive T-Cell
What time does the cuckoo clock read?a. 8:10b. 5:00c. 11:40d. 2:35
How do I mark someone Brainliest? If someone answers me this I will mark them Brainliest as a reward, plus 15 points! Deal or No Deal?
What are the concepts of resilience, grit, and last stand? 1) Resilience is the ability to bounce back from adversity, grit is the perseverance and passion for
You start a game with a score of 0. You lose 4 points on each of the first three turns. How many points will you lose in all on those three turns? What will you
Define the situation when old memories interfere with the recall of newer memories.
Explain the humour in it hit me not the car
Which of the following hormones has a major role in promoting leaf abscissiona) brassinosteroidsb) abscisic acidc) ethylened) gibberellinse) auxins
What do larger Ka and Kb values indicate?
Imagine two pots boiling on a stove. One is tall, while one is wide. Both contain the same volume of water. What will be the difference in the rate of evaporati