if 8 people do a job in 40 hours. How many people need to do the job in 32 hours?

Respuesta :

breadsticksandcheese
breadsticksandcheese breadsticksandcheese
  • 23-06-2021

Answer:

6 people

Step-by-step explanation:

8/40 = x/32

multiply both sides by 32: 8(32)/40 = x

x = 256/40

= 6.4

≈ 6

Answer Link

Otras preguntas

Alliyah and Zarduk Tors are tired of the unrest in their country. Over dinner one night, they discuss the possibility of leaving their country for a new nation.
Which is not a legacy of ancient greece? a advancements in geometry and physics b symmetry and balance in architecture c trial by peers d checks and balances
Name all the numbers from 1 – 100, which have the letter ‘A’ in their spellings
what role can l play in my community
What are 3 examples of cooperative federalism at work?
Forces come in pairs. What are these pairs called
Before her birthday, Lynette had $230 in her savings account. She received a total of $75 as gifts. What was the percent of change in her account balance? Round
Does anyone know how to find initial velocity with out acceleration or distance given
“I think that it is high time that we remembered that the Constitution speaks not only of the freedom of speech but also of trial by jury instead of trial by ac
What type of laws force government officials to hold open meetings? A. common laws B. sunset laws C. civil laws D. sunshine laws