When building a house, the number of days required to build varies inversely with
with the number of workers. One house was built in 21 days by 17 workers. How
many days would it take to build a similar house with 7 workers?

Respuesta :

angelxziplier
angelxziplier angelxziplier
  • 26-05-2021

Answer:

51 days

Step-by-step explanation:

17/7= 2.428

2.428*21=50.988=51

Answer Link

Otras preguntas

What Are the Pros and Cons of Auditory Learning?
Help with line equations?
Which of the following is a simile? a. The blood was alive, like the dog. b. No matter how fast he runs, the wet feet Will freeze the harder. c. He should no
Please tell me what is a Tonal Language?
When you look at green dots with a red filter what color did you see?
the length of a rectangular prism is 8height : 1surface area:250what is volume and width
Convert y=x squared +64x + 12 into graphing form
Circumference of a circle is 40 π cm. A quarter of the circle represents the developer layer genuine coupe. Calculate the surface compartment.
what is answer to 12=4x what is x
Snow was quickly piling up on the ground. Wind howled through the trees. Karen wrapped a planket around her and sighed as she watched the snow through her bedro