jennibalaoing
jennibalaoing jennibalaoing
  • 24-05-2021
  • Mathematics
contestada

Johnson Construction Company is going to build a house on a concrete slab. The slab is to have dimensions 30 feet by 20 feet by 2 feet. How many cubic feet of concrete should the construction company order

Respuesta :

ursupacool ursupacool
  • 27-05-2021

Answer:

1200ft^3

Step-by-step explanation:

30 x 20 x 2= 1200^3

Answer Link

Otras preguntas

In 1876, the telephone ______ first introduced by Bell and Watson.
while drinking 8 glasses of water a day is good for your health if each glass of water is equivalent to 148 ml how many liters of water you need to consume ever
Sum of three consecutive odd integers is 57. What are the three consecutive even numbers? Write an equation.
what christmas song was originally a thanksgiving song
how to lower blood pressure instantly in an emergency
they (talk) about me when I interrupted their conversation​
the loss of self-awareness and self-restraint occurring in group situations that foster arousal and anonymity is called
Which represents the solution set of 5(x+5) <85? X<12 Χ> 12 X< 16 Χ<16
3 ideas principales del libro de doña barbara link: pagina 8 plis es para hoy
2. Which of the following shows a translation of f(x) two units to the left? f(x - 2) f(x)- f(x + 2) f(x) + 2