A construction company can remove 8 1/4 metric tons of dirt from a construction site in 5 1/2 hours what is the unit rate in metric tons per hour?

Respuesta :

clarch19
clarch19 clarch19
  • 22-03-2021

Answer:

1 1/2 tons per hour

Step-by-step explanation:

8 1/4 ÷ 5 1/2

Answer Link

Otras preguntas

Pressure is defined as the force per unit
I have 4 times as much money as my brother.our total is $d.How much money do wwe each have
Quién fue el personaje más destacado del congreso de Viena y qué cargo ocupaba en su país
shahrikaran se paryavaran kis prakar prabhavit hoga (10 panktiyan likho)
Draw a line segment of length 9.5cm.Construct a perpendicular bisector of AB
by rounding each number to 1 significant figure, estimate the answer to: 23.4x13.9/0.18
Offer a possible evolutionary explanation for how the bones of animal limbs can have a similar structure, but very different functions.
- Find the least number by which 1800 is divided so that the quotient will be a perfect square. Find the least number which is to be added to 9238 to make it a
NEED HELP AS FAST AS POSSIBLE! 35 POINTS!
Martin's school is due west of his house and due south of his friend Hayley's house. The distance between the school and Hayley's house is 12 kilometers and the