HappyPom2675 HappyPom2675
  • 25-11-2020
  • Business
contestada

The ________ summarizes the tasks to be accomplished and who is responsible for what on a project.

Respuesta :

andromache andromache
  • 27-11-2020

Answer:

Responsibility matrix

Explanation:

The responsibility matrix deals with the various kind of the responsibilities that specified the task that should be achieved and the type of responsibility that each one of them is responsible for their work

It is also known as the linear responsibility chart

Therefore the responsibility matrix is the answer and the same is to be considered

Answer Link

Otras preguntas

what was the primary purpose of southern implementation of black codes
The greenhouse effect is a result of
Choose the equation of the horizontal line that passes through the point (-8,-7),
which container holds more a half gallon milk jug or a 2 liter juice bottle
What inventions and technological advancements changed lives as part of the market revolution?
if a golf ball and bowling ball are moving and both have the same kinetic energy. Which one moving faster? If they move at the same speed, which one has more ki
estimate the product of 51 and 48
the cell organelles that burns glucose and provides ATP for active transport are the
What led Adolfo hittler to order German submarines to attack American ships?
Bob bought 24 hockey tickets for $83. Adult tickets cost $5.50 and child tickets cost $2.00. How many of each did he buy?