briannamartinez143
briannamartinez143 briannamartinez143
  • 24-11-2020
  • Mathematics
contestada

A large snowplow can clear a parking lot in 5 hours. A small snowplow needs 8
hours to clear the lot. Working together, how long would it take them to clear the
lot?

Respuesta :

nhill061925 nhill061925
  • 24-11-2020

Answer:

16.5 I think

Step-by-step explanation:

can you let me know if you are working on finding averages right now? Bc if so the answer I gave is right bc I just did the average of the two.

Answer Link

Otras preguntas

What is the distance between (-4,-8) and (-4,0) round to the nearest tenth if needed​
Alan threw 8 grams of sugar into 32 grams of water. He made ______ grams of _______% sugar syrup.
Evaluate this!! Plzzzz!
Which drawing material is a type of fluid media
Which type of government can be absolute, granting citizens little political power, or constitutional, granting citizens a much greater amount of political powe
Arla and kal both work in jobs they get paid by the hour in their first week on the job they each worked 40 hours and together there total earnings were $1300 i
The square of a number exceeds that number by 12. What are the two possible solutions? A.) 3 or -4 B.) 3 or 4 C.) -3 or 4
Why do I keep losing my crown thingies (brainliest answers) and I lost 2 ranks in the last month? HOW? WHY? I'm starting to get aggravated with this thing. I hi
What is a non comunicable disease
Please help me with Part D? (It’s due tomorrow February 25th)