mireyagonzaless146 mireyagonzaless146
  • 24-01-2020
  • Business
contestada

Resource leveling is a network scheduling technique that seeks to assign nearly equivalent work units to each member of the project team True False

Respuesta :

Emhicee
Emhicee Emhicee
  • 26-01-2020

Answer:

False

Explanation:

Resource leveling in project management is a technique used to ensure that over-allocation of resource or conflicts as a result of over-allocation does not occur.

Cheers

Answer Link

Otras preguntas

What was Jefferson’s ideal occupation of Americans?
what adds up to positive 14 but multiplies to negative 147
Triangles PQR and XYZ are similar. What is the length of XZ?
6. Kori is on a road trip to Colorado, and uses the equation y = 60x+ 200 to determine the number of miles she has driven after x hours. If she drives for a max
What do all cations have in common? Check all that apply. A. positive B. negative C. metals D. non-metals
"An American Looks Back at British Victory in the French and Indian War, 1763
Do you think the girl and the note are from the Thought Police or the underground?
my baby chickie is chuuu pretty
There are 20 black, 15 white, 12 green, 12 red, 9 blue, and 2 yellow candies in a box. How many candies should you take (without looking at them) to be sure tha
Fill in the blanks with the correct form of the verb indicated. 1. Elena 2. Damon y Stefan 3. Caroline y yo 4. ¿Matt, 5. Jeremy y Tú 6. Elijah 7. Enzo Y Bonnie