A crate is lifted vertically 1.5 m and then held at rest. The crate has weight 100 N (i.e., it is supported by an upward force of 100 N). How much work is being done to hold the crate 1.5 m above the ground in this way? 1. 150 J 2. More than 150 J 3. None of these 4. A bit less than 150 J 5. No work is being done.