smithsierra28323 smithsierra28323
  • 25-08-2019
  • Mathematics
contestada

I’m not quite sure. Any help?

Im not quite sure Any help class=

Respuesta :

ItzNatalieWyd0
ItzNatalieWyd0 ItzNatalieWyd0
  • 25-08-2019
I would say technician B is probably right when talking about a construction sight. Construction sights could be worked on in storms, near power lines, or be near power sources when doing their job. It’s also heavy so in case there is wind or something when they are attempting to scale a building, it’s not as dangerous as the aluminum.
Answer Link

Otras preguntas

Most of the mass in a growing tree comes from what? Trunk CO2 Leaves Oxygen
What accounts for 30-35% for the environmental causes of cancer?
write the past form of the verb. 1:read en ingles
Suppose that instead of leasing the Accord, Nigel decides to buy the Honda Accord for $22,180. Would this contract need to be in writing to be enforceable?
Slope Find Value of Zero
Question 5 (Fill-In-The-Blank Worth 5 points) (04.01 LC) The coordinates of point Aon a grid are (5.-3). Point A is reflected across the x-axis to obtain point
use this branching diagram to answer the questions. IF U DONT KNOW THE ANSWER THEN DONT PUT AN ANSWER. Look at the possible derived shared characteristics, show
9 and 7 find the length of the third side
what is going if there is no atmospheric greenhouse
Solve for X 2x-10/4 = 3x X=-10 X=-1 X=2 X=11