sparklegrace7974 sparklegrace7974
  • 26-04-2024
  • Business
contestada

The Master schedule of Sims manufacturing shows a production demand of 600 items of which 340 have been sold. The remaining 260 items are:
a) Safety Stock
b) Stockout
c) Available to Promise
d) Lead Time
e) MRP

Respuesta :

Otras preguntas

If a jar of honey sits for a long time, sugar may crystallize in the jar. Describe two possible causes for the crystallization.
What is not a characteristic of ethnicity? language race religion politics
Suppose that you are given two unlabeled beakers. One beaker contains water, and the other beaker contains a solution of ethanol and water. How could you safely
Explain why a solution can have many solutes, but only one solvent.
Bob bought 24 hockey tickets for $83. Adult tickets cost $5.50 and child tickets cost $2.00. How many of each did he buy?
write the standard form of 6.45 billion?
Simplify the expression as much as possible. sin(2x)cos(x)
a ball rebounds one-half the distance that it falls. If the ball is dropped from a height of 512 feet how high does it go on its 8th rebound?
write the standard form of 6.45 billion?
At Brian's bookstore, 0.3 of the shelves hold mysteries 25% of the shelves hold traveling books, and 7/20 of the shelves hold children's books. Which type of bo