sofiakeogh1625 sofiakeogh1625
  • 23-04-2024
  • Computers and Technology
contestada

The table contains order-dependent setup times for three jobs. The optimal processing sequence is ABC. What is the total setup time?
1) 7
2) 10
3) 14

Respuesta :

Otras preguntas

A MILKMAN SOLD TWO OF HIS BUFFALOES FOR RS.20,000. EACH ON ONE HE MADE A GAIN OF 5% AND ON THE OTHER A LOSS OF 10%. FIND HIS OVERALL GAIN OR LOSS.
what caused the dust bowl
if f(x)=2x+1,what is f(-3)
How do you simplify 11c + 3(-5c + 4d)?
Good thesis statement on how Androids better than iPhones?
the perimeter of a square is 1 meter. how many centimeters long is each side?
I have been stuck on this question and i would like to know how to solve it ? A mother horse and a baby horse walk 10 miles from point A to point B. The mother’
i need help writing an equation from a graph
How do you simplify 11c + 3(-5c + 4d)?
What ingredients are needed to make GHB?