The method is a top-down approach of estimation which uses historical data of past projects that are relatively standard to allocate duration and costs to various segments of the current project. What is this method called?
1) Bottom-up approach
2) Analogous estimation
3) Parametric estimation
4) Expert judgment

Respuesta :

Otras preguntas

A 10 kg ball is traveling at the same speed as a 1 kg ball. Compared to the 10 kg ball, the 1 kg ball has
Evaluate –x + (–7.5) for x = 6.3. A. –13.8 B. 13.8 C. 1.2 D. –1.2
What is the solution to the system of equations? y = 1.5x – 4 y = –x (–1.6, 1.6) (–1.5, 1.5) (1.5, –1.5) (1.6, –1.6)
Which lines from President Reagan’s Address at Moscow State University contain an opinion? Check all that apply. Nancy couldn't make it today because she's vis
Current can flow only downhill in a water conduit because of:
You are paid $82.50 for 71212 hours of work. What is your rate of pay?
while the majority of south asians work in the _____ sector, the ___ sector makes up much of the gdp
What elements make The Diary of a Young Girl by Anne Frank a memoir?
Find g(1) if g(x) = x 2 + 1.
What is the logic of computer science.