ernestinebell7937 ernestinebell7937
  • 25-02-2024
  • Computers and Technology
contestada

The purpose of Value Analysis/Value Engineering (VA/VE) is to:
a) Increase costs and decrease quality
b) Decrease costs and increase quality
c) Increase costs and increase quality
d) Decrease costs and decrease quality

Respuesta :

Otras preguntas

For the main group elements( excluding the transition elements) , is it necessary to memorize the type of ion each element makes or could you predict the ion ch
what is 680605 in expanded form
sarah and Eva are swimming use the ratio table to determine who is the faster swimmer
what are all the ways scientists do investigations
32 over 36 in simplest form
How are vacuoles like storage bins?
(2 to the power of 5) multiplied by (x to the power of three) divided by (2 to the power of four) multiplied by (x to the power of 2)
What are the first organisms to grow in new or disturbed areas
Sophia can run 8 miles per hour what is this speed in feet per hour.
in sahara desert one day it was 136. In the gobi desert a temperature of -5 was recorded. What is the difference between these two temperatures